Plate 88 of 102QueensQueens Community Board 7

Willets Point - Triangle Parcel

This site can hold about 280–355 homes under the zoning maximum for qualifying affordable housing. The top of that range is set by the dwelling unit limit (ZR 23-52); qualifying senior housing is exempt from it and could hold up to about 399. The City's LIFT tracker lists 350 homes.

City Planning's 2024 report gives about 350 homes for the Triangle residential building, matching the tracker.

  • Index entry
  • Tracker status: Post Public Approval
  • Lead agency: EDC

View in ZoLa (lot 1 of 3)Checks and sources

Plate 88. Willets Point - Triangle Parcel: block 1833, lots 117, 118, 119, Queens. The site is tinted pink; neighboring lots are outlined and other City-owned lots are hatched.1787183320110211112014014114315115817275018311711811938th Avenue39th AvenueRoosevelt AvenueWillets Point BoulevardN0500 ft

Block 1833, lots 117, 118, 119Tax lots from MapPLUTO; street names from the Digital City Map. Pink: this site. Hatched: other City-owned lots. Heavy lines: block edges.

What City documents say

Facts from City documents that bear on the figures below. Each is quoted in the sources, and each speaks as of its document's date.

  • Zoning lot shared with Phase 1; gets stadium floor area

    The Triangle zoning lot combines this City-owned Phase 2 land with the Phase 1 affordable-housing lots to the south. A 2024 special permit (C 240092 ZSQ, approved April 11, 2024) moves up to 291,423 square feet of floor area from the stadium lot to the Triangle, for an overall FAR of about 6.1.

  • Planned: ~350 affordable homes plus a 250-room hotel

    The approved plan puts two buildings on this Phase 2 land: a residential building of about 350 income-restricted homes with ground-floor retail, and a 250-room hotel. None of the City documents checked says which of the current tax lots each building will use.

  • The 2024 lot was split into three tax lots

    The City Planning Commission named the land as Block 1833, Lot 117 in 2024. City tax maps for 2025-2026 show that land as Lots 117, 118 and 119.

Floor area follows exactly from the Zoning Resolution. Homes are a range, because unit size and building efficiency are choices.

Lot area
100,673 sq ft
Zoning district
C4-4
Maximum residential floor area
201,346 sq ft100,673 sq ft × 2.00 FAR
With qualifying affordable or senior housing
241,615 sq ft100,673 sq ft × 2.40 FAR
Maximum community facility floor area
201,346 sq ft100,673 sq ft × 2.00 FAR

Homes, as a range

CaseHomesHow
Low282241,615 sq ft × 0.7 ÷ 599 sq ft
Base349241,615 sq ft × 0.8 ÷ 553 sq ft
High355241,615 sq ft × 0.85 ÷ 514 sq ft = 399, capped at 241,615 ÷ 680 (ZR 23-52)

Floor area × efficiency ÷ average home size. Efficiency 0.7–0.85; average home 514–599 sq ft. Assumptions and their basis.

What binds first

Flood hazard

All of the site is in FEMA's 2015 Preliminary Flood Insurance Rate Map 1% annual chance floodplain (zone AE). NYC uses this map for flood-resistant construction rules. Flood-resistant construction shapes the ground floor and can reduce usable floor area.

What the neighborhood asked for

Queens Community Board 7's formal requests to the City, from its annual Statement of Community District Needs and Budget Requests.

Each quotation below was found word for word on the cited page by script. None reviewed by a person yet.

Other requests in these categories

  • Older adultsCapital request to Department for the Aging

    Mitchel Linden & College Point

    “Create a new Senior Center or other facilities for Seniors. Reinstate the Mitchell Linden Senior and a new Senior Center in College Point. …”

    FY2027 statement, p. 28 · priority 1 of 1 within the agency · awaiting a person's review

    ResponseFurther study by the agency of this request is needed.

  • Older adultsExpense request to Department for the Aging

    Other senior center program requests

    “DFTA During FY 24 received $59.6 Million in new funds -FY 23Home delivered meals 1140 clients CW. FY 24 Case Management served 334 clients CW. …”

    FY2027 statement, p. 34 · priority 1 of 1 within the agency · awaiting a person's review

    ResponseFurther study by the agency of this request is needed.

  • LibrariesExpense request to Queens Borough Public Library

    Library Programs

    “Extend library hours enhance and expand programs and increase book budget CB#7 is one of the most ethnically diverse communities in the city. …”

    FY2027 statement, p. 38 · priority 1 of 1 within the agency · awaiting a person's review

    ResponseRestoring and/or increasing funding is needed for this request. It is recommended that this request be brought to the attention of your elected officials i.e. Borough President and/or City Council Member.

  • Open spaceCapital request to Department of Parks and Recreation

    Little Bay Park

    “Construction of a new playground in Little Bay Park The area is heavily used by children and families and their is no playground for the …”

    FY2027 statement, p. 31 · priority 10 of 12 within the agency · awaiting a person's review

    ResponseThe agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.

What gets in the way

Flags are flags, not verdicts. Each comes from a public layer, named in the sources.

  • Hazard

    In the 1% annual chance floodplain (2015 preliminary map)

    All of the site is in FEMA's 2015 Preliminary Flood Insurance Rate Map 1% annual chance floodplain (zone AE). NYC uses this map for flood-resistant construction rules.

  • Hazard

    In the 1% annual chance floodplain (effective 2007 map)

    All of the site is in the 1% annual chance floodplain on FEMA's effective 2007 Flood Insurance Rate Map, which flood insurance still uses (MapPLUTO flags it too).

  • Hazard

    Stormwater flooding in a moderate storm (2050s)

    DEP's Stormwater Flood Map (moderate stormwater flood with 2050 sea level rise) shows flooding on about 14% of the site (14,100 sq ft), nearly all of it nuisance flooding (4 in to 1 ft).

  • Hazard

    Stormwater flooding in an extreme storm (2080s)

    DEP's Stormwater Flood Map (extreme stormwater flood with 2080 sea level rise) shows nuisance flooding (4 in to 1 ft) and deep and contiguous flooding (1 ft or more) on about 84% of the site (84,800 sq ft).

  • Caution

    (E) designation E-214 and E-758

    On lot 117 (1 of the 3 lots), an environmental requirement (hazardous materials, air quality and noise) must be satisfied before the Department of Buildings issues permits for new development.

  • Note

    In the Special Willets Point District

    Replaces the underlying bulk rules: zoning lots under 200,000 sq ft are capped at 2.0 FAR (2.4 for affordable or senior housing); larger lots have total-FAR caps by area and location, with 120 percent of the cap for affordable or senior housing. Its floor area rules are applied above (ZR 124-21).

Nearest subway station: Mets-Willets Point (7), 0.2 mi in a straight line.

What this doesn't account for

Public data and the zoning text answer the questions above. These need information that is not public, or a decision that belongs to the City.

  • Public land use review (ULURP). Selling or leasing City land, or approving a housing project on it, generally goes through ULURP (community board, borough president, City Planning Commission, City Council), and this estimate does not presume the outcome.
  • Disposition of City property (Charter 384 / UDAAP). Transferring the land needs Mayoral approval under Charter Sec. 384 and, for HPD projects, usually Urban Development Action Area designation and project approval under NY General Municipal Law Article 16.
  • Environmental review (CEQR/SEQRA). Any discretionary approval, disposition or City funding triggers CEQR/SEQRA review, which can require mitigation (e.g. for hazardous materials, noise or historic resources) or reshape the project.
  • (E) designations. A lot with an (E) designation or environmental restrictive declaration for hazardous materials, air quality or noise cannot receive building permits until the Office of Environmental Remediation signs off.
  • Subsurface and site conditions. Unknown soil, rock, groundwater and contamination can shrink or eliminate cellars and add foundation and cleanup costs, and HPD requires every project to investigate and, if needed, remediate contamination.
  • Deed restrictions and reverter clauses. Land the City bought or sold may carry deed restrictions or reverter clauses limiting its use, which must be checked in title records (ACRIS) and DCAS's deed-restriction database.
  • Parkland alienation. If a site is municipal parkland, it cannot be sold or used for housing without an act of the State Legislature signed by the Governor.
  • Current occupants, uses and agency plans. Many City-owned lots are in active use or assigned to an agency, or have funded capital projects, and this estimate does not reflect relocation needs or agency plans (check COLP and the Capital Commitment Plan).
  • Mapped streets, easements and utilities. Mapped-but-unbuilt ('paper') streets, sewer and water easements and utility lines can take land out of the buildable area, and no permit may be issued for a building in the bed of a mapped street.
  • Street access. A lot with no frontage on a mapped street cannot get a building permit on its own and must be combined with a neighboring lot or have access mapped.
  • Landmarks review. Sites that are individual landmarks or inside historic districts need Landmarks Preservation Commission approval, which can limit demolition, height and bulk.
  • Flood-resistant construction. Sites in the 1% annual chance floodplain (or the 0.2% shaded X-Zone for critical facilities) must meet Building Code Appendix G, whose elevation and floodproofing rules can cost usable ground-floor and cellar space.
  • Airport height limits. Near JFK, LaGuardia and Floyd Bennett Field, zoning flight-obstruction surfaces cap building height, and tall structures anywhere need FAA notice.
  • State and federal funding conditions. Federal or State money brings its own requirements (e.g. HUD environmental review under 24 CFR Part 58, Davis-Bacon prevailing wages, Section 3 hiring) that can change cost, timing and program.
  • Zoning capacity is a ceiling, not a plan. The figures show what zoning allows, and actual HPD projects often build less, for example to fit neighborhood context, a community facility or funding limits.

Checks

What has been verified on this page, and by what.

Tax lots (3)
4-01833-0117, 4-01833-0118, 4-01833-0119Confirmed against City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit) and DOF Digital Tax Map tax lot polygons, Block 1833 (NYC Open Data i38t-6if2)
Lot and zoning records compared with DCP's live data
Agrees
Figures reproduced by a separate calculation
Agrees
Notes
On September 25, 2026, the MapPLUTO records and zoning district map behind this page were compared with DCP's live MapPLUTO (26v2) and zoning district layers for all 3 of its lots; every compared field and district boundary matched. A separate calculation, written from the method page and run on the same downloaded City data on September 25, 2026, reproduced the 3 lots and their area (100,673 sq ft), the zoning portions, the floor area (standard 201,346; with qualifying affordable or senior housing 241,615; community facility 201,346 sq ft), the homes (low 282, base 349, high 355), and the flags and what limits the site first.

Sources

Superscript numbers next to figures refer to this list. Select one to see the source.

  1. LIFT Tracker (Land Inventory Fast Track), ArcGIS layer LIFT_Tracker/FeatureServer/0Dataset · NYC Mayor's Office · as of July 30, 2026 · retrieved September 23, 2026
  2. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit), PDF page 3, project area (retrieved 2026-09-25)Document · NYC City Planning Commission · as of March 6, 2024
  3. DOF Digital Tax Map tax lot polygons, Block 1833 (NYC Open Data i38t-6if2), records for Lots 117, 118, 119 (effective tax year 2025-2026) versus Lots 111 and 120 (2023-2024); dataset updated 2026-09-02, queried 2026-09-25Document · NYC Department of Finance · as of September 2, 2026
  4. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit), PDF page 9, project description (retrieved 2026-09-25)Document · NYC City Planning Commission · as of March 6, 2024
  5. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit), PDF page 15, requested actions (Stadium Lot) (retrieved 2026-09-25)Document · NYC City Planning Commission · as of March 6, 2024
  6. MapPLUTO 26v2Dataset · NYC Department of City Planning · as of September 9, 2026 · retrieved September 25, 2026
  7. Zoning Resolution § 34-112, C4-4 residential equivalent: R7-2Zoning Resolution · NYC Department of City Planning
  8. Zoning Resolution § 124-21, Special Willets Point District, Area A: C4-4: 2.00 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  9. Zoning Resolution § 124-21, Special Willets Point District, Area A: C4-4, qualifying affordable housing or qualifying senior housing: 2.40 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  10. Declared assumption: building efficiency, low 0.7, base 0.8, high 0.85Declared assumption · as of September 23, 2026
  11. Declared assumption: average home size (net), low 514, base 553, high 599 sq ftDeclared assumption · as of September 23, 2026
  12. Zoning Resolution § 23-52, Dwelling unit factor 680Zoning Resolution · NYC Department of City Planning
  13. FEMA 2015 Preliminary Flood Insurance Rate Map (flood hazard zones) 360497_20150130Dataset · FEMA, via NYC Department of City Planning · as of March 16, 2026 · retrieved September 25, 2026
  14. 2022 NYC Building Code, Appendix G (Flood-Resistant Construction), § G102.2Document · NYC Department of Buildings
  15. FEMA 2015 Preliminary Flood Insurance Rate Map: area of each lot in each zone 360497_20150130Dataset · FEMA, via NYC Department of City Planning · as of March 16, 2026 · retrieved September 25, 2026
  16. FEMA 2007 effective Flood Insurance Rate Map: area of each lot in each zoneDataset · FEMA, via NYC Department of City Planning · as of March 16, 2026 · retrieved September 25, 2026
  17. NYC Stormwater Flood Map: Moderate stormwater flood with 2050 sea level riseDataset · NYC Department of Environmental Protection, via NYC Department of City Planning · as of September 8, 2025 · retrieved September 25, 2026
  18. NYC Stormwater Flood Map: Moderate stormwater flood with 2050 sea level rise: area of each lot in each categoryDataset · NYC Department of Environmental Protection, via NYC Department of City Planning · as of September 8, 2025 · retrieved September 25, 2026
  19. NYC Stormwater Flood Map: Extreme stormwater flood with 2080 sea level riseDataset · NYC Department of Environmental Protection, via NYC Department of City Planning · as of September 8, 2025 · retrieved September 25, 2026
  20. NYC Stormwater Flood Map: Extreme stormwater flood with 2080 sea level rise: area of each lot in each categoryDataset · NYC Department of Environmental Protection, via NYC Department of City Planning · as of September 8, 2025 · retrieved September 25, 2026
  21. (E) Designations 20260707Dataset · NYC Department of City Planning · as of August 12, 2026 · retrieved September 25, 2026
  22. Special district floor area rules, 28 special districts, 22 floor area rulesZoning Resolution · Public Ground, from the NYC Zoning Resolution
  23. Zoning Resolution § 124-20, Special Willets Point DistrictZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  24. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027, PDF p. 28Document · NYC Department of City Planning · retrieved September 23, 2026
  25. FY2027 Register of Community Board Budget Requests (Adopted Budget), Queens Community Board 7 FY2027 Adopted, Agency responseDocument · NYC Office of Management and Budget · as of June 30, 2026
  26. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027, PDF p. 34Document · NYC Department of City Planning · retrieved September 23, 2026
  27. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027, PDF p. 38Document · NYC Department of City Planning · retrieved September 23, 2026
  28. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027, PDF p. 31Document · NYC Department of City Planning · retrieved September 23, 2026
  29. MTA Subway StationsDataset · Metropolitan Transportation Authority · as of September 25, 2026 · retrieved September 25, 2026
  30. Digital City Map street centerlinesDataset · NYC Department of City Planning · as of December 1, 2025 · retrieved September 25, 2026
  31. New York City Charter Sec. 197-c (Uniform land use review procedure), Sec. 197-c(a)(8) and (a)(10)Document
  32. NYC Charter Sec. 384 (Disposal of property of the city), Sec. 384(a)Document
  33. CEQR Technical Manual, Chapter 2 (December 2025 edition), PDF p. 1 (printed p. 2-1)Document
  34. Zoning Resolution 11-15 (Environmental Requirements), ZR 11-15(a); last amended 2012-03-28Document
  35. HPD Design Guidelines for New Construction 2026, PDF p. 13, Secs. 1.1.1 and 1.1.4Document
  36. Deed Restriction Database (NYC Open Data rfu7-paqe), dataset descriptionDocument
  37. Handbook on the Alienation and Conversion of Municipal Parkland (NYS OPRHP, revised 2017-09-01), PDF p. 3, 'Parkland Alienation'Document
  38. City Owned and Leased Property (COLP), NYC Open Data fn4k-qyk2, dataset description (version 20260430)Document
  39. NY General City Law Sec. 35, GCL 35Document
  40. NY General City Law Sec. 36, GCL 36Document
  41. LPC - Applications page, page textDocument
  42. 2022 NYC Building Code, Appendix G (as amended by Local Law 77 of 2023), PDF p. 1, Sec. G102.1Document
  43. Zoning Resolution 61-21 (Restriction on Highest Projection of Building or Structure), ZR 61-21; 61-11 designates JFK, LaGuardia and U.S. Naval Air Station (Floyd Bennett Field)Document
  44. HPD ELLA Term Sheet (updated 2020-03-10), PDF p. 4Document
  45. CPC report C 260071 HAM (1727 Amsterdam Avenue), PDF p. 8Document
  46. Zoning districts (NYZD)Dataset · NYC Department of City Planning · as of August 17, 2026 · retrieved September 25, 2026
1. LIFT Tracker (Land Inventory Fast Track)
Dataset · NYC Mayor's Office
Where
ArcGIS layer LIFT_Tracker/FeatureServer/0
As of
July 30, 2026
Retrieved
September 23, 2026

One point per project. BBLs resolved by point-in-lot against MapPLUTO, HPD's Local Law 125 report, or address geocoding; see the method page.

Open source

2. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit)
Document · NYC City Planning Commission
Where
PDF page 3, project area (retrieved 2026-09-25)
As of
March 6, 2024

The Triangle zoning lot is bounded by Roosevelt Avenue and 39th Avenue to the south, Seaver Way on the west, 38th Avenue to the north, and 126th Lane to the east. The Phase 2 portion (Block 1833, Lot 117) is currently vacant and owned by the City. The Phase 1 portion (Lots 120, 130, 135 and 140) is the site of active construction

Open source

3. DOF Digital Tax Map tax lot polygons, Block 1833 (NYC Open Data i38t-6if2)
Document · NYC Department of Finance
Where
records for Lots 117, 118, 119 (effective tax year 2025-2026) versus Lots 111 and 120 (2023-2024); dataset updated 2026-09-02, queried 2026-09-25
As of
September 2, 2026

Record excerpt"lot":"118","bbl":"4018330118","easement_flag":"E","effective_tax_year":"2025-2026"

Open source

4. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit)
Document · NYC City Planning Commission
Where
PDF page 9, project description (retrieved 2026-09-25)
As of
March 6, 2024

Triangle Lot The Phase 2 portion would contain two buildings including an approximately 215,000-square-foot, 250-room hotel and approximately 399,000-square-foot residential building with ground floor retail. The residential building would consist of 100 percent income-restricted residential floor area (approximately 350 units)

Open source

5. City Planning Commission report C 240092 ZSQ (Willets Point Phase II special permit)
Document · NYC City Planning Commission
Where
PDF page 15, requested actions (Stadium Lot) (retrieved 2026-09-25)
As of
March 6, 2024

Up to 291,423 square feet of zoning floor area to the Triangle Lot to achieve an overall FAR of approximately 6.1.

Open source

6. MapPLUTO 26v2
Dataset · NYC Department of City Planning
As of
September 9, 2026
Retrieved
September 25, 2026

Open source

7. Zoning Resolution § 34-112
Zoning Resolution · NYC Department of City Planning
Where
C4-4 residential equivalent: R7-2

C1-6 C2-6 C4-4 C4-5 C6-1 | R7-2

Open source

8. Zoning Resolution § 124-21
Zoning Resolution · NYC Department of City Planning
Where
Special Willets Point District, Area A: C4-4: 2.00 FAR
As of
September 10, 2026

Zoning lots containing less than 200,000 square feet of lot area shall not exceed a floor area ratio of 2.0.

Open source

9. Zoning Resolution § 124-21
Zoning Resolution · NYC Department of City Planning
Where
Special Willets Point District, Area A: C4-4, qualifying affordable housing or qualifying senior housing: 2.40 FAR
As of
September 10, 2026

However, for qualifying affordable housing or qualifying senior housing, the maximum residential floor area ratio shall be 2.4.

Open source

10. Declared assumption: building efficiency
Declared assumption
Where
low 0.7, base 0.8, high 0.85
As of
September 23, 2026

Net home area as a share of residential floor area. Basis: 2025 HCR Design Guidelines, PDF p. 40, Sec. 3.4.1a 'Overall Building Efficiency', Table 3.4.1; 2025 HCR Design Guidelines, PDF p. 40, Sec. 3.4.1; Market & Financial Study: NYC Mandatory Inclusionary Housing (BAE Urban Economics, BJH Advisors, James Lima Planning + Development), PDF p. 68 (printed p. 64), Appendix C, Table C-1 'Developer Interview Summary'; Market & Financial Study: NYC Mandatory Inclusionary Housing, PDF p. 41 (printed p. 37), 'Zoning and Floor Area Ratio'; HPD Design Guidelines for New Construction 2026, PDF p. 28, 'Unit Area Calculation'. A declared assumption; no City agency publishes this ratio.

Open source

11. Declared assumption: average home size (net)
Declared assumption
Where
low 514, base 553, high 599 sq ft
As of
September 23, 2026

HPD target net areas by bedroom count, weighted by HPD's observed bedroom mix. Basis: HPD Design Guidelines for New Construction 2026, PDF p. 31, Sec. 4.4.1; HPD Design Guidelines for New Construction 2026, PDF p. 33, Sec. 4.5.1; HPD Design Guidelines for New Construction 2026, PDF p. 36, Sec. 4.6.1; HPD Design Guidelines for New Construction 2026, PDF p. 39, Sec. 4.7.1; HPD Design Guidelines for New Construction 2026, PDF p. 42, Sec. 4.8.1; HPD Design Guidelines for New Construction 2026, PDF p. 6, 'Applicability'; HPD Design Guidelines for New Construction, Version 2.02 (edition in force before 2026-10-01), PDF pp. 42-58 (e.g. p. 44 for 0-BR, p. 58 for 4-BR), Secs. 5.3-5.8 tables 'TARGET NET'; HPD ELLA Term Sheet (Extremely Low & Low-Income Affordability), PDF p. 5, 'Design and Construction Requirements'; Affordable Housing Production by Building (NYC Open Data hg8x-zxpr), fields studio_units, _1_br_units ... _6_br_units; filter reporting_construction_type='New Construction' AND all_counted_units >= total_units - 1.

Open source

12. Zoning Resolution § 23-52
Zoning Resolution · NYC Department of City Planning
Where
Dwelling unit factor 680

In the districts indicated, for buildings containing multiple dwelling residences, the maximum number of dwelling units permitted shall be determined by dividing the maximum residential floor area permitted on the zoning lot by the applicable dwelling unit factor. ... For all other types of multiple dwelling residences, the applicable dwelling unit factor shall be 680. Fractions equal to or greater than three-quarters resulting from this calculation shall be considered to be one dwelling unit.

Open source

13. FEMA 2015 Preliminary Flood Insurance Rate Map (flood hazard zones) 360497_20150130
Dataset · FEMA, via NYC Department of City Planning
As of
March 16, 2026
Retrieved
September 25, 2026

Open source

14. 2022 NYC Building Code, Appendix G (Flood-Resistant Construction)
Document · NYC Department of Buildings
Where
§ G102.2

Uses FEMA's 2015 Preliminary FIRMs for flood hazard areas, and the higher of the 2007 or 2015 maps for elevations.

Open source

15. FEMA 2015 Preliminary Flood Insurance Rate Map: area of each lot in each zone 360497_20150130
Dataset · FEMA, via NYC Department of City Planning
As of
March 16, 2026
Retrieved
September 25, 2026

Open source

16. FEMA 2007 effective Flood Insurance Rate Map: area of each lot in each zone
Dataset · FEMA, via NYC Department of City Planning
As of
March 16, 2026
Retrieved
September 25, 2026

Open source

17. NYC Stormwater Flood Map: Moderate stormwater flood with 2050 sea level rise
Dataset · NYC Department of Environmental Protection, via NYC Department of City Planning
As of
September 8, 2025
Retrieved
September 25, 2026

Open source

18. NYC Stormwater Flood Map: Moderate stormwater flood with 2050 sea level rise: area of each lot in each category
Dataset · NYC Department of Environmental Protection, via NYC Department of City Planning
As of
September 8, 2025
Retrieved
September 25, 2026

Open source

19. NYC Stormwater Flood Map: Extreme stormwater flood with 2080 sea level rise
Dataset · NYC Department of Environmental Protection, via NYC Department of City Planning
As of
September 8, 2025
Retrieved
September 25, 2026

Open source

20. NYC Stormwater Flood Map: Extreme stormwater flood with 2080 sea level rise: area of each lot in each category
Dataset · NYC Department of Environmental Protection, via NYC Department of City Planning
As of
September 8, 2025
Retrieved
September 25, 2026

Open source

21. (E) Designations 20260707
Dataset · NYC Department of City Planning
As of
August 12, 2026
Retrieved
September 25, 2026

Open source

22. Special district floor area rules
Zoning Resolution · Public Ground, from the NYC Zoning Resolution
Where
28 special districts, 22 floor area rules

Floor area rules of special purpose districts, authored from the Zoning Resolution (text as of 2026-09-10) with a quoted section for every value.

Open source

23. Zoning Resolution § 124-20
Zoning Resolution · NYC Department of City Planning
Where
Special Willets Point District
As of
September 10, 2026

In the Special Willets Point District, bulk regulations shall be as set forth in this Section, inclusive.

Open source

24. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027
Document · NYC Department of City Planning
Where
PDF p. 28
Retrieved
September 23, 2026

Open source

25. FY2027 Register of Community Board Budget Requests (Adopted Budget), Queens Community Board 7 FY2027 Adopted
Document · NYC Office of Management and Budget
Where
Agency response
As of
June 30, 2026

Open source

26. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027
Document · NYC Department of City Planning
Where
PDF p. 34
Retrieved
September 23, 2026

Open source

27. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027
Document · NYC Department of City Planning
Where
PDF p. 38
Retrieved
September 23, 2026

Open source

28. FY2027 Statement of Community District Needs and Community Board Budget Requests, Queens Community Board 7 FY2027
Document · NYC Department of City Planning
Where
PDF p. 31
Retrieved
September 23, 2026

Open source

29. MTA Subway Stations
Dataset · Metropolitan Transportation Authority
As of
September 25, 2026
Retrieved
September 25, 2026

Open source

30. Digital City Map street centerlines
Dataset · NYC Department of City Planning
As of
December 1, 2025
Retrieved
September 25, 2026

Open source

31. New York City Charter Sec. 197-c (Uniform land use review procedure)
Document
Where
Sec. 197-c(a)(8) and (a)(10)

(8) Housing and urban renewal plans and projects pursuant to city, state and federal housing laws; ... (10) Sale, lease (other than the lease of office space), exchange, or other disposition of the real property of the city

Open source

32. NYC Charter Sec. 384 (Disposal of property of the city)
Document
Where
Sec. 384(a)

No real property of the city may be sold, leased, exchanged or otherwise disposed of except with the approval of the mayor and as may be provided by law unless such power is expressly vested by law in another agency.

Open source

33. CEQR Technical Manual, Chapter 2 (December 2025 edition)
Document
Where
PDF p. 1 (printed p. 2-1)

CEQR requires all city agencies to determine whether discretionary actions they directly approve, fund, or undertake may significantly and adversely affect the environment.

Open source

34. Zoning Resolution 11-15 (Environmental Requirements)
Document
Where
ZR 11-15(a); last amended 2012-03-28

Prior to issuing a building permit or temporary or final certificate of occupancy ... on a tax lot that has an (E) designation or an environmental restrictive declaration related to hazardous materials, noise or air quality, the Department of Buildings (DOB) shall be furnished with a notice issued by OER stating that OER does not object

Open source

35. HPD Design Guidelines for New Construction 2026
Document
Where
PDF p. 13, Secs. 1.1.1 and 1.1.4

1.1.1 Avoid excessive excavation. Particularly in areas with unknown subsurface conditions, and where rock or high-water tables are prevalent, proposed cellars may have to be reduced, relocated, or even eliminated.

Open source

36. Deed Restriction Database (NYC Open Data rfu7-paqe)
Document
Where
dataset description

A searchable electronic database of all real property upon which a deed restriction was imposed by the Department of Citywide Administrative Services, pursuant to Local Law 176 of 2016.

Open source

37. Handbook on the Alienation and Conversion of Municipal Parkland (NYS OPRHP, revised 2017-09-01)
Document
Where
PDF p. 3, 'Parkland Alienation'

In order to convey parkland away, or to use parkland for another purpose, a municipality must receive prior authorization from the State in the form of legislation enacted by the New York State Legislature and approved by the Governor.

Open source

38. City Owned and Leased Property (COLP), NYC Open Data fn4k-qyk2
Document
Where
dataset description (version 20260430)

City Owned and Leased Properties (COLP) is published by the Department of City Planning (DCP) as required by chapter 204 of the City Charter. It includes the location and current use of all City-owned and leased properties.

Open source

39. NY General City Law Sec. 35
Document
Where
GCL 35

For the purpose of preserving the integrity of such official map or plan no permit shall hereafter be issued for any building in the bed of any street or highway shown or laid out on such map or plan

Open source

40. NY General City Law Sec. 36
Document
Where
GCL 36

No permit for the erection of any building shall be issued unless a street or highway giving access to such proposed structure has been duly placed on the official map or plan

Open source

41. LPC - Applications page
Document
Where
page text

The Landmarks Preservation Commission (LPC) helps preserve the City's designated landmark properties by regulating changes made to these buildings and sites.

Open source

42. 2022 NYC Building Code, Appendix G (as amended by Local Law 77 of 2023)
Document
Where
PDF p. 1, Sec. G102.1

This appendix, in conjunction with the New York City Construction Codes, provides minimum requirements for development located, in whole or in part, in special flood hazard areas and shaded X-Zones within the jurisdiction of New York City

Open source

43. Zoning Resolution 61-21 (Restriction on Highest Projection of Building or Structure)
Document
Where
ZR 61-21; 61-11 designates JFK, LaGuardia and U.S. Naval Air Station (Floyd Bennett Field)

the highest projection of any building or other structure hereafter constructed ... shall not penetrate: (a) the approach surfaces, the transitional surfaces, the horizontal surface, or the conical surface, whichever is more restrictive, within the Airport Approach District of the flight obstruction area

Open source

44. HPD ELLA Term Sheet (updated 2020-03-10)
Document
Where
PDF p. 4

Projects funded with Federal funds require compliance with Section 3 new hires and Davis Bacon prevailing wages, as applicable.

Open source

45. CPC report C 260071 HAM (1727 Amsterdam Avenue)
Document
Where
PDF p. 8

while CHO increased the maximum floor area permitted on the project site, the project sponsor does not intend to take advantage of the additional floor area.

Open source

46. Zoning districts (NYZD)
Dataset · NYC Department of City Planning
As of
August 17, 2026
Retrieved
September 25, 2026

Open source