Public Ground

Plate 51 of 102BrooklynBrooklyn Community Board 3

Fulton-Howard West (Bed-Stuy MSC)

A vacant HPD lot on Fulton Street is not counted here

HPD's 2020 request for proposals names the Fulton Street land as Block 1548, Lots 26-29 and 129. The City's current tax lot data have no Lot 129. The vacant lot between Lots 28 and 29 is Lot 128 (1968 Fulton Street, 2,000 sq ft), which MapPLUTO and City Register records show as HPD's; none of the planning documents names it. It is left out of the figures, which would be about 2,000 sq ft of land larger with it.

This site can hold about 245–312 homes under the zoning maximum for qualifying affordable housing. The top of that range is set by the dwelling unit limit (ZR 23-52); qualifying senior housing is exempt from it and could hold up to about 351. The City's LIFT tracker lists 250-400 homes. The top of that range is more than the 312 homes the dwelling unit limit (ZR 23-52) allows under current zoning on the lots shown here; it is also more than the high estimate for qualifying senior housing, which the limit does not cover.

None of the City documents checked gives the tracker's 250 to 400 homes; the May 2026 announcement says only that the project will deliver hundreds of affordable homes.

  • Index entry
  • Tracker status: Pre-RFP
  • Lead agency: HPD

View in ZoLa (lot 1 of 5)Checks and sources

Plate 51. Fulton-Howard West (Bed-Stuy MSC): block 1548, lots 19, 26, 27, 28, 29, Brooklyn. The site is tinted pink; neighboring lots are outlined and other City-owned lots are hatched.153015481556451213151617181936651303233575859606162631345678910121311519113117161721241926272829Fulton StreetHerkimer StreetHoward AvenueMacdougal StreetN0200 ft

Block 1548, lots 19, 26, 27, 28, 29Tax lots from MapPLUTO; street names from the Digital City Map. Pink: this site. Hatched: other City-owned lots. Heavy lines: block edges.

What City documents say

Facts from City documents that bear on the figures below. Each is quoted in the sources, and each speaks as of its document's date.

  • Operating Multi-Service Center stays open until construction

    The site includes the Bedford-Stuyvesant Multi-Service Center at 1958 Fulton Street, where organizations provide homelessness prevention, education, arts and mentorship programs. In May 2026 the City said these services will keep operating until construction begins and the organizations will later move into new space in the completed development.

  • Former P.S. 28 school building is on the site

    The Multi-Service Center occupies the former P.S. 28 school building, with an adjacent track and open space; the City describes the building as in significant disrepair. The May 2026 announcement does not say whether the building will be kept or replaced.

  • Early planning: engagement under way, no RFP yet

    In May 2026 HPD and HRA began community engagement to inform a future request for proposals; the announcement named no developer or building program.

  • HPD's vacant Fulton Street lots are part of the site

    HPD's 2020 Bedford-Stuyvesant request for proposals listed land on Fulton Street just west of Howard Avenue (Block 1548, Lots 26-29 and 129) as a future RFP site. The 2020 Bedford-Stuyvesant Housing Plan, appended to that request, said HPD owned a site next to the Multi-Service Center and that HPD and HRA were exploring developing the two together. The 2026 announcement includes the neighboring vacant City-owned land.

Floor area follows exactly from the Zoning Resolution. Homes are a range, because unit size and building efficiency are choices.

Lot area
58,000 sq ft
Zoning district
R6B, R7D; commercial overlay C2-4 on part of the site
Maximum residential floor area
176,772 sq ft35,153.5 sq ft R6B × 2.00 + 22,846.5 sq ft R7D × 4.66
With qualifying affordable or senior housing
212,309 sq ft35,153.5 sq ft R6B × 2.40 + 22,846.5 sq ft R7D × 5.60
Maximum community facility floor area
176,772 sq ft35,153.5 sq ft R6B × 2.00 + 14,846.5 sq ft R7D × 4.66 + 8,000 sq ft R7D under a C2-4 overlay × 4.66

Homes, as a range

CaseHomesHow
Low248212,309 sq ft × 0.7 ÷ 599 sq ft
Base307212,309 sq ft × 0.8 ÷ 553 sq ft
High312212,309 sq ft × 0.85 ÷ 514 sq ft = 351, capped at 212,309 ÷ 680 (ZR 23-52)

Floor area × efficiency ÷ average home size. Efficiency 0.7–0.85; average home 514–599 sq ft. Assumptions and their basis.

What binds first

Split zoning (needs a closer read)

One lot is divided between zoning districts (R6B and R7D), each covering at least a tenth of it. Floor area is computed portion by portion. Where the district line falls on the lot shapes what can go where, so the figures above deserve a closer read against the zoning map.

What the neighborhood asked for

Brooklyn Community Board 3's formal requests to the City, from its annual Statement of Community District Needs and Budget Requests.

Each quotation below was found word for word on the cited page by script. None reviewed by a person yet.

Housing the board asked for

  • HousingCapital request to Department of Housing Preservation & Development

    Provide more housing for low income households

    “The pace and breadth of new affordable housing does not meet the demand resulting in widespread displacement and it is significantly impacting neighborhood demographics. …”

    FY2027 statement, p. 33 · priority 1 of 2 within the agency · awaiting a person's review

    ResponseThe Executive Budget includes a city-wide allocation for this work. Specific locations are determined by the Agency.

Other requests in these categories

  • LibrariesCapital request to Brooklyn Public Library

    Create a new, or renovate or upgrade an existing public library

    “The Marcy Library has several large capital needs. They include ADA compliant bathrooms, safety and security enhancements, exterior renovation, interior renovation including initial outfitting, furniture, …”

    FY2027 statement, p. 35 · priority CS within the agency · awaiting a person's review

    ResponseRestoring and/or increasing funding is needed for this request. It is recommended that this request be brought to the attention of your elected officials i.e. Borough President and/or City Council Member.

  • LibrariesExpense request to Brooklyn Public Library

    Visually Impaired and Low Vision Access

    “Our library branches can better serve the needs of low-vision and visually impaired patrons by providing assistive technology devices such as magnifiers, scanners, lighting, and …”

    FY2027 statement, p. 37 · priority 1 of 3 within the agency · awaiting a person's review

    ResponseFurther study by the agency of this request is needed. Therefore, OMB does not take any position.

  • LibrariesCapital request to Brooklyn Public Library

    Create a new, or renovate or upgrade an existing public library

    “The Board requests support for that the longstanding, needed repair of the retaining wall at the Macon Library be funded. …”

    FY2027 statement, p. 35 · priority CS within the agency · awaiting a person's review

    ResponseThis project was funded in a prior fiscal year and the final design contract has been let.

  • LibrariesExpense request to Brooklyn Public Library

    Extend library hours or expand and enhance library programs

    “The Board requests the expansion and enhancement of programming at African American Heritage Center at the Macon Library including the acquisition of databases, collection materials, …”

    FY2027 statement, p. 37 · priority 2 of 3 within the agency · awaiting a person's review

    ResponseIt is recommended that this request be brought to the attention of your Elected Officials.

  • LibrariesExpense request to Brooklyn Public Library

    African American Heritage Center Expansion and Enhancement

    “The Board requests the expansion and enhancement of programming at African American Heritage Center at the Macon Library including the acquisition of databases, collection materials, …”

    FY2027 statement, p. 37 · priority 3 of 3 within the agency · awaiting a person's review

    ResponseIt is recommended that this request be brought to the attention of your Elected Officials.

What gets in the way

Flags are flags, not verdicts. Each comes from a public layer, named in the sources.

  • Caution

    (E) designation E-185

    On lot 26, lot 27, lot 28 and lot 29 (4 of the 5 lots), an environmental requirement (hazardous materials and noise) must be satisfied before the Department of Buildings issues permits for new development.

  • Caution

    1 of 5 lots has a building on it

    Block 1548 lot 19 has a building on record with 150,000 sq ft of gross building area, completed around 1912 (MapPLUTO; gross area includes space zoning does not count). Zoning counts floor area already on a lot toward its maximum, so the figures above are the most the land could hold in total, not what could be added while that building stands.

  • Caution

    Split zoning

    One lot is divided between zoning districts (R6B and R7D), each covering at least a tenth of it. Floor area is computed portion by portion.

Nearest subway station: Ralph Av (C), 290 ft in a straight line.

What this doesn't account for

Public data and the zoning text answer the questions above. These need information that is not public, or a decision that belongs to the City.

  • Public land use review (ULURP). Selling or leasing City land, or approving a housing project on it, generally goes through ULURP (community board, borough president, City Planning Commission, City Council), and this estimate does not presume the outcome.
  • Disposition of City property (Charter 384 / UDAAP). Transferring the land needs Mayoral approval under Charter Sec. 384 and, for HPD projects, usually Urban Development Action Area designation and project approval under NY General Municipal Law Article 16.
  • Environmental review (CEQR/SEQRA). Any discretionary approval, disposition or City funding triggers CEQR/SEQRA review, which can require mitigation (e.g. for hazardous materials, noise or historic resources) or reshape the project.
  • (E) designations. A lot with an (E) designation or environmental restrictive declaration for hazardous materials, air quality or noise cannot receive building permits until the Office of Environmental Remediation signs off.
  • Subsurface and site conditions. Unknown soil, rock, groundwater and contamination can shrink or eliminate cellars and add foundation and cleanup costs, and HPD requires every project to investigate and, if needed, remediate contamination.
  • Deed restrictions and reverter clauses. Land the City bought or sold may carry deed restrictions or reverter clauses limiting its use, which must be checked in title records (ACRIS) and DCAS's deed-restriction database.
  • Parkland alienation. If a site is municipal parkland, it cannot be sold or used for housing without an act of the State Legislature signed by the Governor.
  • Current occupants, uses and agency plans. Many City-owned lots are in active use or assigned to an agency, or have funded capital projects, and this estimate does not reflect relocation needs or agency plans (check COLP and the Capital Commitment Plan).
  • Mapped streets, easements and utilities. Mapped-but-unbuilt ('paper') streets, sewer and water easements and utility lines can take land out of the buildable area, and no permit may be issued for a building in the bed of a mapped street.
  • Street access. A lot with no frontage on a mapped street cannot get a building permit on its own and must be combined with a neighboring lot or have access mapped.
  • Landmarks review. Sites that are individual landmarks or inside historic districts need Landmarks Preservation Commission approval, which can limit demolition, height and bulk.
  • Flood-resistant construction. Sites in the 1% annual chance floodplain (or the 0.2% shaded X-Zone for critical facilities) must meet Building Code Appendix G, whose elevation and floodproofing rules can cost usable ground-floor and cellar space.
  • Airport height limits. Near JFK, LaGuardia and Floyd Bennett Field, zoning flight-obstruction surfaces cap building height, and tall structures anywhere need FAA notice.
  • State and federal funding conditions. Federal or State money brings its own requirements (e.g. HUD environmental review under 24 CFR Part 58, Davis-Bacon prevailing wages, Section 3 hiring) that can change cost, timing and program.
  • Zoning capacity is a ceiling, not a plan. The figures show what zoning allows, and actual HPD projects often build less, for example to fit neighborhood context, a community facility or funding limits.

Checks

What has been verified on this page, and by what.

Tax lots (5)
3-01548-0019, 3-01548-0026, 3-01548-0027, 3-01548-0028, 3-01548-0029Confirmed against Mayor Mamdani, HPD Kick Off Public Engagement Process for New Affordable Housing and Community Services in Bedford-Stuyvesant and Bedford-Stuyvesant Community Wealth and Wellness RFP
Lot and zoning records compared with DCP's live data
Agrees
Figures reproduced by a separate calculation
Agrees
Notes
On September 25, 2026, the MapPLUTO records and zoning district map behind this page were compared with DCP's live MapPLUTO (26v2) and zoning district layers for all 5 of its lots; every compared field and district boundary matched. A separate calculation, written from the method page and run on the same downloaded City data on September 25, 2026, reproduced the 5 lots and their area (58,000 sq ft), the zoning portions, the floor area (standard 176,772; with qualifying affordable or senior housing 212,309; community facility 176,772 sq ft), the homes (low 248, base 307, high 312), and the flags and what limits the site first.

Sources

Superscript numbers next to figures refer to this list. Select one to see the source.

  1. LIFT Tracker (Land Inventory Fast Track), ArcGIS layer LIFT_Tracker/FeatureServer/0Dataset · NYC Mayor's Office · as of July 30, 2026 · retrieved September 23, 2026
  2. Mayor Mamdani, HPD Kick Off Public Engagement Process for New Affordable Housing and Community Services in Bedford-Stuyvesant, Press release, paragraph beginning 'The future development site includes' (retrieved 2026-09-24)Document · Office of the Mayor / NYC HPD · as of May 7, 2026
  3. Bedford-Stuyvesant Community Wealth and Wellness RFP, PDF p.4 (printed p.2), Introduction, list of remaining RFP sites (file 'Bed-Stuy Ph I RFP_Final_20201119.pdf' in the zip; retrieved 2026-09-25)Document · NYC HPD · as of November 20, 2020
  4. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West), Press release, third paragraph (retrieved 2026-09-24)Document · Office of the Mayor / NYC HPD · as of May 7, 2026
  5. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West), Press release, paragraph beginning 'Organizations currently operating at the MSC' (retrieved 2026-09-24)Document · Office of the Mayor / NYC HPD · as of May 7, 2026
  6. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West), Press release, second paragraph (retrieved 2026-09-24)Document · Office of the Mayor / NYC HPD · as of May 7, 2026
  7. The Bedford-Stuyvesant Housing Plan (2020), appended to the Bedford-Stuyvesant Community Wealth and Wellness RFP, PDF p.107 (Housing Plan p.53), Future RFPs, Fulton-Howard West (file 'Bed-Stuy Ph I RFP_Final_20201119.pdf' in the zip)Document · NYC Department of Housing Preservation and Development · as of November 20, 2020
  8. MapPLUTO 26v2 (live) record for Brooklyn Block 1548, Lot 128, feature attributes for BBL 3015480128 (retrieved 2026-09-25)Document · NYC Department of City Planning (MAPPLUTO feature service) · as of September 25, 2026
  9. ACRIS legal records, Brooklyn Block 1548 Lot 128 (and Lot 129), Records for lot 128 (document 2012073101244001, CTOR, City of New York to City of New York c/o HPD); query for lot 129 returned no records on 2026-09-25Document · NYC Department of Finance, City Register (NYC Open Data 8h5j-fqxa) · as of July 31, 2015
  10. MapPLUTO 26v2Dataset · NYC Department of City Planning · as of September 9, 2026 · retrieved September 25, 2026
  11. Zoning Resolution § 23-22, R6B: 2.00 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  12. Zoning Resolution § 23-22, R7D: 4.66 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  13. Zoning Resolution § 23-22, R6B, qualifying affordable housing or qualifying senior housing: 2.40 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  14. Zoning Resolution § 23-22, R7D, qualifying affordable housing or qualifying senior housing: 5.60 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  15. Zoning Resolution § 24-11, R6B: 2.00 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  16. Zoning Resolution § 24-11, R7D: 4.66 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  17. Zoning Resolution § 33-121, C2-4; C2-4 mapped within R7D District (suffixed variants included per ZR 11-25) — zoning lot containing only community facility use (Column B); a zoning lot with both commercial and community facility uses: 4.66 total (Column C): 4.66 FARZoning Resolution · NYC Department of City Planning · as of September 10, 2026
  18. Declared assumption: building efficiency, low 0.7, base 0.8, high 0.85Declared assumption · as of September 23, 2026
  19. Declared assumption: average home size (net), low 514, base 553, high 599 sq ftDeclared assumption · as of September 23, 2026
  20. Zoning Resolution § 23-52, Dwelling unit factor 680Zoning Resolution · NYC Department of City Planning
  21. Zoning districts (NYZD)Dataset · NYC Department of City Planning · as of August 17, 2026 · retrieved September 25, 2026
  22. (E) Designations 20260707Dataset · NYC Department of City Planning · as of August 12, 2026 · retrieved September 25, 2026
  23. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027, PDF p. 33Document · NYC Department of City Planning · retrieved September 23, 2026
  24. FY2027 Register of Community Board Budget Requests (Adopted Budget), Brooklyn Community Board 3 FY2027 Adopted, Agency responseDocument · NYC Office of Management and Budget · as of June 30, 2026
  25. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027, PDF p. 35Document · NYC Department of City Planning · retrieved September 23, 2026
  26. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027, PDF p. 37Document · NYC Department of City Planning · retrieved September 23, 2026
  27. MTA Subway StationsDataset · Metropolitan Transportation Authority · as of September 25, 2026 · retrieved September 25, 2026
  28. Digital City Map street centerlinesDataset · NYC Department of City Planning · as of December 1, 2025 · retrieved September 25, 2026
  29. New York City Charter Sec. 197-c (Uniform land use review procedure), Sec. 197-c(a)(8) and (a)(10)Document
  30. NYC Charter Sec. 384 (Disposal of property of the city), Sec. 384(a)Document
  31. CEQR Technical Manual, Chapter 2 (December 2025 edition), PDF p. 1 (printed p. 2-1)Document
  32. Zoning Resolution 11-15 (Environmental Requirements), ZR 11-15(a); last amended 2012-03-28Document
  33. HPD Design Guidelines for New Construction 2026, PDF p. 13, Secs. 1.1.1 and 1.1.4Document
  34. Deed Restriction Database (NYC Open Data rfu7-paqe), dataset descriptionDocument
  35. Handbook on the Alienation and Conversion of Municipal Parkland (NYS OPRHP, revised 2017-09-01), PDF p. 3, 'Parkland Alienation'Document
  36. City Owned and Leased Property (COLP), NYC Open Data fn4k-qyk2, dataset description (version 20260430)Document
  37. NY General City Law Sec. 35, GCL 35Document
  38. NY General City Law Sec. 36, GCL 36Document
  39. LPC - Applications page, page textDocument
  40. 2022 NYC Building Code, Appendix G (as amended by Local Law 77 of 2023), PDF p. 1, Sec. G102.1Document
  41. Zoning Resolution 61-21 (Restriction on Highest Projection of Building or Structure), ZR 61-21; 61-11 designates JFK, LaGuardia and U.S. Naval Air Station (Floyd Bennett Field)Document
  42. HPD ELLA Term Sheet (updated 2020-03-10), PDF p. 4Document
  43. CPC report C 260071 HAM (1727 Amsterdam Avenue), PDF p. 8Document
  44. Commercial Overlay Districts (NYCO) 202607Dataset · NYC Department of City Planning · as of August 17, 2026 · retrieved September 25, 2026
1. LIFT Tracker (Land Inventory Fast Track)
Dataset · NYC Mayor's Office
Where
ArcGIS layer LIFT_Tracker/FeatureServer/0
As of
July 30, 2026
Retrieved
September 23, 2026

One point per project. BBLs resolved by point-in-lot against MapPLUTO, HPD's Local Law 125 report, or address geocoding; see the method page.

Open source

2. Mayor Mamdani, HPD Kick Off Public Engagement Process for New Affordable Housing and Community Services in Bedford-Stuyvesant
Document · Office of the Mayor / NYC HPD
Where
Press release, paragraph beginning 'The future development site includes' (retrieved 2026-09-24)
As of
May 7, 2026

The future development site includes the Bedford-Stuyvesant MSC at 1958 Fulton Street, including the former P.S. 28 school building and adjacent track and open space, along with neighboring vacant City-owned land.

Open source

3. Bedford-Stuyvesant Community Wealth and Wellness RFP
Document · NYC HPD
Where
PDF p.4 (printed p.2), Introduction, list of remaining RFP sites (file 'Bed-Stuy Ph I RFP_Final_20201119.pdf' in the zip; retrieved 2026-09-25)
As of
November 20, 2020

The three remaining RFP sites are located: mid-block on Myrtle Avenue between Nostrand and Marcy Avenues (Block 1754, Lots 24-32), on Fulton Street just west of Howard Avenue (Block1548, Lots 26-29 and 129)

Open source

4. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West)
Document · Office of the Mayor / NYC HPD
Where
Press release, third paragraph (retrieved 2026-09-24)
As of
May 7, 2026

The new project will deliver hundreds of affordable homes, new community amenities and modernized space for the organizations currently operating out of the Multi-Service Center, which is in significant disrepair.

Open source

5. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West)
Document · Office of the Mayor / NYC HPD
Where
Press release, paragraph beginning 'Organizations currently operating at the MSC' (retrieved 2026-09-24)
As of
May 7, 2026

Organizations currently operating at the MSC provide homelessness prevention services, education, arts and social justice programming and mentorship programs. Those services will remain in operation until construction begins, and the City has committed to ensuring continuity of services throughout the development process.

Open source

6. Mayor Mamdani, HPD Kick Off Public Engagement Process (Fulton-Howard West)
Document · Office of the Mayor / NYC HPD
Where
Press release, second paragraph (retrieved 2026-09-24)
As of
May 7, 2026

The Fulton-Howard West site includes the Bedford-Stuyvesant Multi-Service Center (MSC) and adjacent vacant City-owned land on Fulton Street in Brooklyn. This spring and summer, HPD and the Human Resources Administration (HRA) will lead a robust community engagement process that will inform a future Request for Proposals to develop the site.

Open source

7. The Bedford-Stuyvesant Housing Plan (2020), appended to the Bedford-Stuyvesant Community Wealth and Wellness RFP
Document · NYC Department of Housing Preservation and Development
Where
PDF p.107 (Housing Plan p.53), Future RFPs, Fulton-Howard West (file 'Bed-Stuy Ph I RFP_Final_20201119.pdf' in the zip)
As of
November 20, 2020

HPD owns a site next to the Bed-Stuy Multi-Service Center, which is owned by the Human Resources Administration (HRA). HPD and HRA are exploring how best to maximize affordable housing and community amenities by developing these sites together

Open source

8. MapPLUTO 26v2 (live) record for Brooklyn Block 1548, Lot 128
Document · NYC Department of City Planning (MAPPLUTO feature service)
Where
feature attributes for BBL 3015480128 (retrieved 2026-09-25)
As of
September 25, 2026

Record excerpt"BBL":3015480128,"Address":"1968 FULTON STREET","LotArea":2000,"BldgArea":0,"LandUse":"11","OwnerType":"C","OwnerName":"NYC HOUSING PRESERVATION AND DEVELOPMENT"

Open source

9. ACRIS legal records, Brooklyn Block 1548 Lot 128 (and Lot 129)
Document · NYC Department of Finance, City Register (NYC Open Data 8h5j-fqxa)
Where
Records for lot 128 (document 2012073101244001, CTOR, City of New York to City of New York c/o HPD); query for lot 129 returned no records on 2026-09-25
As of
July 31, 2015

document_id 2012073101244001

Open source

10. MapPLUTO 26v2
Dataset · NYC Department of City Planning
As of
September 9, 2026
Retrieved
September 25, 2026

Open source

11. Zoning Resolution § 23-22
Zoning Resolution · NYC Department of City Planning
Where
R6B: 2.00 FAR
As of
September 10, 2026

R6B | 2.00 | 2.40

Open source

12. Zoning Resolution § 23-22
Zoning Resolution · NYC Department of City Planning
Where
R7D: 4.66 FAR
As of
September 10, 2026

R7D | 4.66 | 5.60

Open source

13. Zoning Resolution § 23-22
Zoning Resolution · NYC Department of City Planning
Where
R6B, qualifying affordable housing or qualifying senior housing: 2.40 FAR
As of
September 10, 2026

R6B | 2.00 | 2.40

Open source

14. Zoning Resolution § 23-22
Zoning Resolution · NYC Department of City Planning
Where
R7D, qualifying affordable housing or qualifying senior housing: 5.60 FAR
As of
September 10, 2026

R7D | 4.66 | 5.60

Open source

15. Zoning Resolution § 24-11
Zoning Resolution · NYC Department of City Planning
Where
R6B: 2.00 FAR
As of
September 10, 2026

R6B | 2.00 | 80 | 60

Open source

16. Zoning Resolution § 24-11
Zoning Resolution · NYC Department of City Planning
Where
R7D: 4.66 FAR
As of
September 10, 2026

R7D | 4.66 | 80 | 65

Open source

17. Zoning Resolution § 33-121
Zoning Resolution · NYC Department of City Planning
Where
C2-4; C2-4 mapped within R7D District (suffixed variants included per ZR 11-25) — zoning lot containing only community facility use (Column B); a zoning lot with both commercial and community facility uses: 4.66 total (Column C): 4.66 FAR
As of
September 10, 2026

R7D | 2.00 | 4.66 | 4.66

Open source

18. Declared assumption: building efficiency
Declared assumption
Where
low 0.7, base 0.8, high 0.85
As of
September 23, 2026

Net home area as a share of residential floor area. Basis: 2025 HCR Design Guidelines, PDF p. 40, Sec. 3.4.1a 'Overall Building Efficiency', Table 3.4.1; 2025 HCR Design Guidelines, PDF p. 40, Sec. 3.4.1; Market & Financial Study: NYC Mandatory Inclusionary Housing (BAE Urban Economics, BJH Advisors, James Lima Planning + Development), PDF p. 68 (printed p. 64), Appendix C, Table C-1 'Developer Interview Summary'; Market & Financial Study: NYC Mandatory Inclusionary Housing, PDF p. 41 (printed p. 37), 'Zoning and Floor Area Ratio'; HPD Design Guidelines for New Construction 2026, PDF p. 28, 'Unit Area Calculation'. A declared assumption; no City agency publishes this ratio.

Open source

19. Declared assumption: average home size (net)
Declared assumption
Where
low 514, base 553, high 599 sq ft
As of
September 23, 2026

HPD target net areas by bedroom count, weighted by HPD's observed bedroom mix. Basis: HPD Design Guidelines for New Construction 2026, PDF p. 31, Sec. 4.4.1; HPD Design Guidelines for New Construction 2026, PDF p. 33, Sec. 4.5.1; HPD Design Guidelines for New Construction 2026, PDF p. 36, Sec. 4.6.1; HPD Design Guidelines for New Construction 2026, PDF p. 39, Sec. 4.7.1; HPD Design Guidelines for New Construction 2026, PDF p. 42, Sec. 4.8.1; HPD Design Guidelines for New Construction 2026, PDF p. 6, 'Applicability'; HPD Design Guidelines for New Construction, Version 2.02 (edition in force before 2026-10-01), PDF pp. 42-58 (e.g. p. 44 for 0-BR, p. 58 for 4-BR), Secs. 5.3-5.8 tables 'TARGET NET'; HPD ELLA Term Sheet (Extremely Low & Low-Income Affordability), PDF p. 5, 'Design and Construction Requirements'; Affordable Housing Production by Building (NYC Open Data hg8x-zxpr), fields studio_units, _1_br_units ... _6_br_units; filter reporting_construction_type='New Construction' AND all_counted_units >= total_units - 1.

Open source

20. Zoning Resolution § 23-52
Zoning Resolution · NYC Department of City Planning
Where
Dwelling unit factor 680

In the districts indicated, for buildings containing multiple dwelling residences, the maximum number of dwelling units permitted shall be determined by dividing the maximum residential floor area permitted on the zoning lot by the applicable dwelling unit factor. ... For all other types of multiple dwelling residences, the applicable dwelling unit factor shall be 680. Fractions equal to or greater than three-quarters resulting from this calculation shall be considered to be one dwelling unit.

Open source

21. Zoning districts (NYZD)
Dataset · NYC Department of City Planning
As of
August 17, 2026
Retrieved
September 25, 2026

Open source

22. (E) Designations 20260707
Dataset · NYC Department of City Planning
As of
August 12, 2026
Retrieved
September 25, 2026

Open source

23. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027
Document · NYC Department of City Planning
Where
PDF p. 33
Retrieved
September 23, 2026

Open source

24. FY2027 Register of Community Board Budget Requests (Adopted Budget), Brooklyn Community Board 3 FY2027 Adopted
Document · NYC Office of Management and Budget
Where
Agency response
As of
June 30, 2026

Open source

25. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027
Document · NYC Department of City Planning
Where
PDF p. 35
Retrieved
September 23, 2026

Open source

26. FY2027 Statement of Community District Needs and Community Board Budget Requests, Brooklyn Community Board 3 FY2027
Document · NYC Department of City Planning
Where
PDF p. 37
Retrieved
September 23, 2026

Open source

27. MTA Subway Stations
Dataset · Metropolitan Transportation Authority
As of
September 25, 2026
Retrieved
September 25, 2026

Open source

28. Digital City Map street centerlines
Dataset · NYC Department of City Planning
As of
December 1, 2025
Retrieved
September 25, 2026

Open source

29. New York City Charter Sec. 197-c (Uniform land use review procedure)
Document
Where
Sec. 197-c(a)(8) and (a)(10)

(8) Housing and urban renewal plans and projects pursuant to city, state and federal housing laws; ... (10) Sale, lease (other than the lease of office space), exchange, or other disposition of the real property of the city

Open source

30. NYC Charter Sec. 384 (Disposal of property of the city)
Document
Where
Sec. 384(a)

No real property of the city may be sold, leased, exchanged or otherwise disposed of except with the approval of the mayor and as may be provided by law unless such power is expressly vested by law in another agency.

Open source

31. CEQR Technical Manual, Chapter 2 (December 2025 edition)
Document
Where
PDF p. 1 (printed p. 2-1)

CEQR requires all city agencies to determine whether discretionary actions they directly approve, fund, or undertake may significantly and adversely affect the environment.

Open source

32. Zoning Resolution 11-15 (Environmental Requirements)
Document
Where
ZR 11-15(a); last amended 2012-03-28

Prior to issuing a building permit or temporary or final certificate of occupancy ... on a tax lot that has an (E) designation or an environmental restrictive declaration related to hazardous materials, noise or air quality, the Department of Buildings (DOB) shall be furnished with a notice issued by OER stating that OER does not object

Open source

33. HPD Design Guidelines for New Construction 2026
Document
Where
PDF p. 13, Secs. 1.1.1 and 1.1.4

1.1.1 Avoid excessive excavation. Particularly in areas with unknown subsurface conditions, and where rock or high-water tables are prevalent, proposed cellars may have to be reduced, relocated, or even eliminated.

Open source

34. Deed Restriction Database (NYC Open Data rfu7-paqe)
Document
Where
dataset description

A searchable electronic database of all real property upon which a deed restriction was imposed by the Department of Citywide Administrative Services, pursuant to Local Law 176 of 2016.

Open source

35. Handbook on the Alienation and Conversion of Municipal Parkland (NYS OPRHP, revised 2017-09-01)
Document
Where
PDF p. 3, 'Parkland Alienation'

In order to convey parkland away, or to use parkland for another purpose, a municipality must receive prior authorization from the State in the form of legislation enacted by the New York State Legislature and approved by the Governor.

Open source

36. City Owned and Leased Property (COLP), NYC Open Data fn4k-qyk2
Document
Where
dataset description (version 20260430)

City Owned and Leased Properties (COLP) is published by the Department of City Planning (DCP) as required by chapter 204 of the City Charter. It includes the location and current use of all City-owned and leased properties.

Open source

37. NY General City Law Sec. 35
Document
Where
GCL 35

For the purpose of preserving the integrity of such official map or plan no permit shall hereafter be issued for any building in the bed of any street or highway shown or laid out on such map or plan

Open source

38. NY General City Law Sec. 36
Document
Where
GCL 36

No permit for the erection of any building shall be issued unless a street or highway giving access to such proposed structure has been duly placed on the official map or plan

Open source

39. LPC - Applications page
Document
Where
page text

The Landmarks Preservation Commission (LPC) helps preserve the City's designated landmark properties by regulating changes made to these buildings and sites.

Open source

40. 2022 NYC Building Code, Appendix G (as amended by Local Law 77 of 2023)
Document
Where
PDF p. 1, Sec. G102.1

This appendix, in conjunction with the New York City Construction Codes, provides minimum requirements for development located, in whole or in part, in special flood hazard areas and shaded X-Zones within the jurisdiction of New York City

Open source

41. Zoning Resolution 61-21 (Restriction on Highest Projection of Building or Structure)
Document
Where
ZR 61-21; 61-11 designates JFK, LaGuardia and U.S. Naval Air Station (Floyd Bennett Field)

the highest projection of any building or other structure hereafter constructed ... shall not penetrate: (a) the approach surfaces, the transitional surfaces, the horizontal surface, or the conical surface, whichever is more restrictive, within the Airport Approach District of the flight obstruction area

Open source

42. HPD ELLA Term Sheet (updated 2020-03-10)
Document
Where
PDF p. 4

Projects funded with Federal funds require compliance with Section 3 new hires and Davis Bacon prevailing wages, as applicable.

Open source

43. CPC report C 260071 HAM (1727 Amsterdam Avenue)
Document
Where
PDF p. 8

while CHO increased the maximum floor area permitted on the project site, the project sponsor does not intend to take advantage of the additional floor area.

Open source

44. Commercial Overlay Districts (NYCO) 202607
Dataset · NYC Department of City Planning
As of
August 17, 2026
Retrieved
September 25, 2026

Open source